週次 |
日期 |
單元主題 |
第1週 |
9/14 |
• Semester introduction;
• Teamwork kick-off (telescopic boom lift) |
第2週 |
9/21 |
• Calculation (telescopic boom lift) review;
• Design analysis tutorial;
• Project I announcement (remotely operated crane) |
第3週 |
9/28 |
• Review of draft design (Project I);
• Distribution of the scale model materials |
第4週 |
10/05 |
• Poster jury and model competition (Project I) |
第5週 |
10/12 |
• Introduction to civil engineering;
• Design concept and process;
• Project II (Exhibit pavilion for the NTU campus) announcement; |
第6週 |
10/19 |
• Review of design proposal II-D1 for Project II (preliminary form, design considerations, sketches);
• Siting and functional design |
第7週 |
10/26 |
• Review of design proposal II-D2 for Project II (site selection, function, site survey)
• Structure – Space, Dimensions, Scale, Form, Shape and Stability |
第8週 |
11/02 |
• Review of design proposal II-D3 for Project II (preliminary structural design)
• Model fabrication tutorial and practice |
第9週 |
11/09 |
• 2D Scale model fabrication II-M1 for Project II |
第10週 |
11/16 |
• Load tests of II-M1;
• Structural analysis discussion |
第11週 |
11/23 |
• Review of alternative design
• 2D Scale model fabrication II-M2 for Project II |
第12週 |
11/30 |
• Load tests of II-M2 |
第13週 |
12/07 |
• Review of final structural design
• Tutorial on design proposal presentation, poster design, and construction drawings |
第14週 |
12/14 |
• Review of final design (general poster, construction drawings) |
第15週 |
12/21 |
• Posters submission |
第16週 |
12/28 |
• Design competition (Project II) |