課程資訊
課程名稱
高科技廠房設施營建
High Tech Facility Construction Management 
開課學期
101-2 
授課對象
工學院  土木工程學系  
授課教師
張陸滿 
課號
CIE7139 
課程識別碼
521 M7270 
班次
 
學分
全/半年
半年 
必/選修
選修 
上課時間
星期二A,B,C(18:25~21:05) 
上課地點
土研402 
備註
上課時間:18:30-21:30。
限學士班三年級以上
總人數上限:60人 
Ceiba 課程網頁
http://ceiba.ntu.edu.tw/1012_CE521_M7270 
課程簡介影片
 
核心能力關聯
核心能力與課程規劃關聯圖
課程大綱
為確保您我的權利,請尊重智慧財產權及不得非法影印
課程概述

The purpose of this course is to provide basic knowledge needed for managing high-tech facility construction project. High-Tech includes, not limited to, the advanced technologies applied in the fields of microelectronics, optoelectronics, precision equipment, telecommunication, nanotech, pharmaceutics, biotech, medical devices, animal experiment, and Aerospace. The construction processes undertaken in high-tech manufacturing plants require special clean-build protocols with extremely tight schedule, stringent quality and safety control as well as effective communication for integrating all the participants.

The focus of this course is on managing high-tech plant construction and engineering its facilities for life-cycle operation. Students will gain methodologies needed to meet ever-changing challenge of delivering an ultra pure and fast moving semiconductor and related Fabs such as wafer, LED, TFT, and/or Photovoltaic. Moreover, this course will strengthen student’s understanding and background in constructing high-tech manufacturing plants and research lab.

 

課程目標
The course will enable the students to:
1.Differentiate the typical processes in IC, Photovoltaic and Bio-medical Fabs.
2.Explain the interdisciplinary nature of high tech Fab construction
3.Perform Site Investigation & Mobilization.
4.Use the basic theories and principles to control Fab Design/Build schedule and perform cost-time trade off.
5.Classify cleanrooms in terms of various international standards.
6.Measure and verify cleanroom.
7.Establish clean-build protocols for constructing and renovating the clean room and other high-tech facilities.
8.Address the issues in automatically integrating the emergency, safety, and security systems.
9.Link to the information sources for further studies in nano/micro fabrication and research.
 
課程要求
This course is intended to offer to both graduate students and undergraduate seniors. Students in engineering, science, pharmacy, and life science will be exposed to fundamental theories and their applications in build/certify/manage of the high tech manufacturing plants. Academic faculty will teach basic theories and principles. Professional industrial experts will be invited to cover the application of theories and principles in the real world practices. The contents will include lectures, home works, a semester team project with an oral presentation and a written report, and a final examination. Field trips to visit high-tech plants and biomedical research labs, and cleanrooms will be arranged. Moreover, laboratory experiments will probably be provided to enable students to have hands-on experiences in the environmental impact on high-tech manufacturing and research._ 
預期每週課後學習時數
 
Office Hours
 
指定閱讀
1. Whyte, W., Cleanroom Technology, John Wiley, New York 2001
2. Class Handouts 
參考書目
1.Chang, C.Y., and Sze, S.M., ULSI Technology, McGraw-Hill Company, Inc., International Edition, 1996, New York.
2.Clifford J. Schexnayder and Richard E. Mayo, Construction Management Fundamentals, McGraw-Hill, New York, 2003, International Edition
3.Food and Drug Administration, Guideline on Sterile Drug Products Produced by Aseptic Processing, FDA, Information Branch, Rockville, Maryland, USA.
4.International Organization for Standards, ISO Standard 14644-4, part 4: Design, Construction, Start up, Geneva, Switzerland, 1999.
5.International Society of Pharmaceutical Engineering, Pharmaceutical Engineering Guide – A Guide for New Facilities, Volume 3: Sterile Manufacturing Facilities, ISPE, 2000.
8.Nishi, Y., Doering, K., and Wooldridge, T., Handbook of Semiconductor Manufacturing Technology, Marcel Dekker, New York, 2000.
7.Oberlender, G. D. Project Management for Engineering and Construction, 2nd Edition, McGraw-Hill, 2000.
8.Project Management Institute (PMI), “A Guide to the Project Management Body of Knowledge,” Newtown Square, PA, USA, 2004.
9.Scherge, M., Biological Micro- and Nanotribiology: Nature’s Solutions, Sprinker, New York, 2001.
10.The Associated General Contractors of America, Construction Planning & Scheduling, Washington, D.C., 1994.
11.Van Zant, Peter, Microchip Fabrication: A Practical Guide to Semiconductor Processing, 8th ed., McGraw-Hill, New York, 2008.
12.Whyte. W., Cleanroom Technology: Fundamentals of Design, Testing, and Operation Operation, Chichester, New York, 2001.
13.半導體奈米技術,龍文安 著,五南(2006)
14.半導體英語,傳田精一 著,陳連春 譯,建興(2003)
15.高科技廠務,顏登通,全華科技(2008)



 
評量方式
(僅供參考)
   
課程進度
週次
日期
單元主題
第1週
2/19  Course Introduction: History and Fundamentals of Nano-Scale Integrated Circuit Manufacturing 
第2週
2/26  Fundamentals of 3D Integrated Circuit  
第3週
3/05  Economics & Profitability of Wafer Manufacturing Industry and the Era of 450mm (18') Wafer & 10 nm Manufacturing  
第4週
3/12  Fab Construction Management Overview, IEST & ISO Construction Bases , 
第5週
3/19  Project Delivery Methods, DB/BOT, Prequalification, Objective Evaluation Matrix 
第6週
3/26  Fundamentals of CPM Scheduling & Floats 
第7週
4/02  Integration Time with Cost and Methods of Shortening Project Duration 
第8週
4/09  Line of Balance for Repetitive Activities, Foundation and Structure Construction, and Safety  
第9週
4/16  No Mid-term Exam, Field Trips on 4/20, 4/21 & 6/1. TSMC Fab14-P6/P7 Construction, Construction Project Management Controls (automation), & 5D Integration on 4/20; ITRI South and Middle Campuses (Green Industrial Parks) on 4/21 ; Group Term Project Progress Report and Field Trip to Academia Sinica(中研院) for Bio-Medical Facility Construction Management on 6/1. 
第10週
4/23  Cleanroom Construction Methods and Management 
第11週
4/30  Construction of Automated Material Handling System, High Performance Metrology Areas (TEM, SEM, ATM...etc.), and Construction of Control Center . 
第12週
5/07  Intelligent Monitoring and Facility Information Modeling 
第13週
5/14  4D Scheduling, Activity Prioritization and Project Expedition  
第14週
5/21  Overall Construction Site Safety, Security and Risk Management 
第15週
5/28  Tools Move-in, (Conventional Immersion, EUV, E-Beam, ArF-dry, Imprint) and Fab Operations and Maintenances 
第16週
6/04  Clean Build, Green Fab Construction, Construction Ethics, Legal Aspects 
第17週
6/11  Group Final Term Project Presentation